01

CONSTRUCTION AND COMMISSIONING OF THE WIND PARK AT THE LOCATION LOGARAKIA WITH A TOTAL POWER OF 18mw, 150kV, 0,675km, SUBCONTRACTOR

07

ERECTION OF 150kV PILLAR TYPE S3, ADJACENT TO THE SUBSTATION 20 / 150kV OF IPATO, 150kV, SUBCONTRACTOR

02

150kV TRANSMISSION LINE INTERCONNECTION, CONNECTING THE 20 / 150kV GOROFAKI WITH THE (ALUMINUM – ROUF) SYSTEM, 150kV, 0,12km, SUBCONTRACTOR

08

TRANSMISSION LINE 150kV SUBSTATION 20 / 150kV IPATO – SYSTEM (LAMIA – SCHIMATARI – PIRGOS ΛΣ 373ΝΞ42N), 150kV, 0.945km, SUBCONTRACTOR

03

WIND FARM “XEROVOUNI”, 150kV, 1,013km, SUBCONTRACTOR

09

SUPPLY OF EQUIPMENT, CONSTRUCTION AND COMMISSIONING OF A SUBSTATION OF RATED POWER 150 / 20kV, 150kV, 0.57km, SUBCONTRACTOR

04

UPGRADE FROM 66kV TO 150kV SECTION OF GM SUBSTATION RODINI – THIS SORONIS  (TOWER N7 TO 75N), 150kV, 23,82km, SUBCONTRACTOR

10

VARIATION IN GM 150kV SUBSTATION AXIOUPOLIS – SYSTEM (KILKIS – OSE POLYKASTROU) – KIP75N / 8N, 150KV, 0.93km, CONTRACTOR

05

TRANSMISSION LINE 150kV SUBSTATION 20 / 150KV ANTHEMION – SYSTEM (AGRA – NAOUSSA PYRGOS AN 45NX43N), 150kV, 0.90km, SUBCONTRACTOR

11

GM 150kV SUBSTATION PYRGOS II – SYSTEM (PYRGOS – KYPARISSIA), 150kV, 0.20km, CONTRACTOR

06

ERECTION OF 150kV TYPE T4 + 4,5 PILLAR, WITHIN THE TERRAIN OF THE SUBSTATION OF 20 / 150kV SIMOPOULOU, 150kV, 0,581km, SUBCONTRACTOR

12

GM 150 kV EUXINOUPOLIS – SYSTEM (SUBSTATION VOLOS INDUSTRIAL ZONE – ALMYROS SUBSTATION), 15kV, 0.15km, CONTRACTOR

13

GM 150kV ROUF – SCHIMATARI (ΡΣ 36-37) REVOCATION OF SECURITY BREACHES IN PROPERTY OWNERSHIP «POTTERY D.I. KOKKINOGENIS SA “, 150kV, 0.50km, CONTRACTOR

19

VARIATION OF GM. 150kV LAMIA – PTOLEMAIDA (IN MUNICIPALITY OF CHARAVGIS), 150kV, 0,60km, CONTRACTOR

14

VARIATION IN GM 150kV N.ALEXANDRIA – KATERINI (UPGRADING OF SECTION NO48 – NO49) SUBSTATION – 1st  PHASE, 150kV, 0.665km, CONTRACTOR

20

COMPLICITY OF THE PROJECT “THESALONIKI – KILKIS DOIRANI” ROAD, WITH 150KV & 400KV TRANSMISSION LINES (ΘΕΦ 47Α), 400kV, 0,47km, CONTRACTOR

15

VARIATION IN GM 150kV N.ALEXANDREIA – KATERINI (UPGRADING OF SECTION NO48 – NO49) SUBSTATION AIGINIO – 2nd PHASE, 150KV, 0.665km, CONTRACTOR

21

VARIANT 150kV LOUROS – IOANNINA (ΛΙ80Ν – ΛΙ81Ν), 150kV, 0,659km, CONTRACTOR

16

GM 150kV SUBSTATION THESSALONIKI – STAGIRA (VARIANT GALARINOS), 150kV, 1,82km, CONTRACTOR

22

RESTORATION OF DAMAGE OF THE GM 150kV LARIMNA – LAMIA – SHIMATARI (ΛΛΣ 43-44-45), 150kV, 0,60km, CONTRACTOR

17

CONSTRUCTION OF THE 150kV GM FOR THE INTERCONNECTION OF KOUNOUPIA SUBSTATION WITH THE ASTROS MOLAOI SUBSTATION NETWORK, 150kV, 1,07km, SUBCONTRACTOR

23

RESTORATION OF SAFETY DISTANCE BREACH OF GM 150 kV ROUF – ALIVERI (PA 173 – 174), 150kV, 0,60km, CONTRACTOR

18

VARIATION OF THE GM 150kV LADON – PATRA (PIROU – PARAPIROU), 150kV, 1,31km, CONTRACTOR

24

COMPLICITY OF GM 150kV AGRA – KAVALA WITH THE UNDER CONSTRUCTION ROAD OF THESSALONIKI (LOCATION: STAVROUPOLI THESSALONIKI), 150kV, 0,60km, CONTRACTOR

25

GM 150 KV ALEXANDROUPOLI – DIDYMOTICHO (ERECTION OF PILLARS – PART OF PROVATONA SUBSTATION– DIDYMOTICHO SUBSTATION P.137 – P.193), 150kV, 19,665km, CONTRACTOR

31

GM 150kV LAMIA – PTOLEMAIDA, KARDIA – FLORINA – PTOLEMAIDA, KARDIA – PTOLEMAIDA (REMOVAL OF GM), 150kV, 5,00km, CONTRACTOR

26

REDEVELOPMENT OF GM 150kV FOR THE CONNECTION OF THE NEW LAGADA ΚΥΤ, 150kV, 1,271km, CONTRACTOR

32

REMOVAL OF FIVE PILLARS OF 150kV TRANSMISSION LINE LAMIA – PTOLEMAIDA, 150kV, 3,60km, CONTRACTOR

27

CONNECTION WORKS OF THE KILKIS SUBSTATION WITH THE NEW LAGADA KYT, CONTRACTOR

33

INSTALLATION OF GROUNDING SYSTEM AT 150kV LAVRIO – GAS TURBINES (LAA2-LAA3-LAA4N-LAA5) & GM 150kV ARGYROUPOLI – LAVRIO (APL106-105), 150 / 400kV, CONTRACTOR

28

WORKS FOR REVOCATING BREACHES WITH THE NEW ROAD KOMOTINI – BULGARIA (EGNATIA ODOS SA), 150kV, 0,60km, CONTRACTOR

34

VARIATION ON THE 150kV LOUROS – IOANNINA (DUE TO IONIA ODOS) (ΛΙ82Ν-ΛΙ91Ν & ΛΙ96Ν), 150kV, 4,00km, CONTRACTOR

29

GM 400kV KYT TRIKALON – KYT DISTOMOU (VARIATION ERGOSE – EKARA), 400kV, 0,70km, CONTRACTOR

35

GM 150kV SCHIMATARI – LARISA (SA NO261 – TITHOREAS AREA), 150kV, 0,70km, CONTRACTOR

30

GM 400KV TRIKALA – DISTOMO (VARIANT E-65) SECTION TD204-212, 400kV, 2,26km, CONTRACTOR